"RamblinRover Luxury-Yacht" (ramblininexile)
11/08/2018 at 17:58 • Filed to: shitposting | 0 | 8 |
Note to self: never try reading a 500 page architectural drawing package all at once. I did that, yesterday. >100mil project the company’s involved in a small corner of . Eyes and brain have not recovered.
Highlander-Datsuns are Forever
> RamblinRover Luxury-Yacht
11/08/2018 at 18:08 | 0 |
T
here are only
20 sheets you need to pay attention to, the rest are just standard details aka filler so the architect
feels like they contributed to the project.
RamblinRover Luxury-Yacht
> Highlander-Datsuns are Forever
11/08/2018 at 18:22 | 1 |
Yeah, but get this: our spec for what we suggested was minimal enough in information that got to me that I wasn’t even aware what floor our thing was going to be on. I had to go searching through the cruft for it. Once I had, some of the relevant details were shuffled around or not in the order you’d think, and stuff related to the project actually ended up involving more than 30 of those pages.
I had to review the piping info, the AHU mechanical info, the isometric ducting view, the other ducting than our project, the lighting, the wiring, the power runs, the ceiling structure, the penthouse level structure, the fire alarm and suppression locations, the penthouse floor, the level 3 floor....
All so I can have some idea of how screwed up things will be if we insist on doing things right rather than how the architect wants them - and those things are very, very different.
Imagine, if you will, that the architect wants a chilled room (35F!)
operated by a conditioner that is 60
feet away and up a level, and we’ve got to find a way to
cut through the mare’s nest
and say “Uh, no”. They are showing trade HVAC ducting over that length, with a “just wrap it, brah”, and supposing so far as to dictate (based on that), a giant mass of mating anacondas of ducting over the rooms. Not any *less* bulky than the “put conditioner *at* the room” plan.
Nom De Plume
> RamblinRover Luxury-Yacht
11/08/2018 at 19:04 | 2 |
I can see the twitch you are developing go full blown by about the tenth set of plans.
Highlander-Datsuns are Forever
> RamblinRover Luxury-Yacht
11/08/2018 at 19:07 | 2 |
Build per plan, when they see it’s total shit, then it’s change order time.
Party-vi
> Highlander-Datsuns are Forever
11/09/2018 at 15:16 | 0 |
This made me LOL.
Highlander-Datsuns are Forever
> Party-vi
11/09/2018 at 15:26 | 0 |
There are some good architects out there I’m sure. I just haven’t met them yet.
wkiernan
> RamblinRover Luxury-Yacht
11/09/2018 at 16:51 | 0 |
Was it a .pdf? I get these 300-
500 page .pdfs all the time. Finding stuff in one of those compares
to finding stuff in a printed plan as copying a fifty page legal description by hand co
mpares with copying the same legal by hand, using your left hand
,
and with your reading glasses replaced with a really dark pair of non
-prescription sunglasses.
RamblinRover Luxury-Yacht
> wkiernan
11/09/2018 at 17:09 | 0 |
Yeah, it was a PDF of 11x17 sized text pages, and I only have like a 20" work monitor, so I put some miles on the scroll wheel, pg up/dn and arrow keys.